日本乱妇-日本另类视频-日本快播-日本看片网站-日本卡通动漫影院网站-日本剧免费网站

歡迎光臨河北漢洋機械制造有限公司網站!
誠信促進發展,實力鑄就品牌
服務熱線:

15531706865

產品分類

Product category

新聞資訊 / news 您的位置:網站首頁 > 新聞資訊 > Construction/ Nomenclature

Construction/ Nomenclature

發布時間: 2020-02-13  點擊次數: 1048次

Caution: Always wear the appropriate protective gear (safety glasses, gloves, safety shoes,
etc.) when working.
TKP35H22 (Formerly TKP0350)
Point of separation
Moving end bracket
Arm
Horizontal divider
Fixed end bracket
Vertical divider
Link
3. Open the arms from each link on either side of the section to be disassembled.
2. Insert a flat-head screwdriver into the gap between links and twist in the direction of the arrow to remove the pin from the hole.
1. Support the other pins and bend the Cableveyor as shown to separate the ends.
3. Align the ends. 2. Overlap the links, and insert the pins into the hole on one side.
1. Push in the other side, insert the pin, and connect.

 
2
 
 
 
1) Opening arms             2) Removing or attaching arms       3) Closing arms
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Attach vertical dividers when filling your Cableveyor with cables & hoses. With the arms open, attach the vertical dividers as follows. 1. Hook one of the catches on the end of the vertical divider into the link. (circled red in photo on right) 2. Snap in the other catch by pushing the divider down in the direction of the arrow.
 
*Either end of the vertical divider can be used. *Insert horizontal dividers into the vertical divider holes first, and then attach the unit to the link. (Note: This will require more than one vertical divider.)
 
 
 
 
Pretension and sag may appear in the free span depending on the application. However, if selected within Tsubaki’s performance graph then there will be no problems with use.
 
 
 
 
 
 
 
 
1. Machine travel end installation height (H’) should be Cableveyor height H + (10-30). 2. Cableveyor space height (h) is H + 100. 3. Install a guide rail. 4. The difference (ε) in the travel end and fixed end bracket attachment sides should be less than 4mm.  5. Use travel cables/hoses with excellent bending and wear properties. 6. Avoid using cables/hoses with wire braiding, as they are easily damaged.
7. Cables/hoses wear easily when used stacked onto of one another. Lay horizontally or use horizontal dividers. 8. Set cables and hoses in the Cableveyor so that they have some play, and clamp both ends. 9. Remove foreign objects from guide rails, as they may cause damage. 10. The following are shipped unassembled and will require assembly when installing the Cableveyor.  (Moving/fixed end) plastic brackets  Vertical/horizontal dividers
 
Any unevenness on the plastic bracket installation surface may damage the bracket. Ensure that the installation surface is as smooth as possible. Over-tightening the installation bolts can also damage the plastic bracket. Please use the following recommended tightening torque.
 
Bolt Size Recommended Tightening Torque M6 2.6 N?m




主站蜘蛛池模板: 按摩院已婚妇女中文字幕| 久久综合狠狠综合久久综合88| 亚洲人的天堂男人爽爽爽| aⅴ天堂小视频| 久久亚洲午夜牛牛影视| 人与善交大片免费看| 免费福利资源站在线视频| 大桥未久aⅴ一区二区| 日本黄色录像视频| 人皮高跟鞋在线观看| 国产成人高清亚洲一区91| eee在线播放成人免费| 国产精品国产国产aⅴ| 91香蕉小视频| 欧美一区二区三区不卡视频| 视频在线观看国产| 日韩欧美一区二区三区免费看| 国产女乱淫真高清免费视频| 国产成人h视频在线播放网站| 丝瓜视频看污片| 奇米影视在线视频8888| 色无月| asspics大尿chinese| 久久精品国产亚洲AV热无遮挡| 高清麻生希在线| 日韩性事| 日韩欧美亚洲一区二区综合| 午夜秀场在线观看| 国产亚洲精品aaa大片| 国产亚洲福利一区二区免费看| 手机看片1024国产| 亚洲成在人线久久综合| 亚洲精品欧洲久久婷婷99| 好爽好舒服视频| 精品视频一区二区三区| 91桃色网站| 俄罗斯bbbbbbxxxxxx| haodiaocao几万部精彩视频| 久久久亚洲国产精品主播 | 美女撒尿毛片免费看| 亚洲卡一卡2卡三卡4卡无卡三|